When comparing Kirloskar gensets in the UAE, you may notice two power ratings against the same model: Prime Rated Power (PRP) and Emergency Standby Power (ESP).
These figures describe different operating duties. Choosing a generator by its higher rating alone can lead to a mismatch between the equipment and the application.
Before requesting a quotation, establish whether the generator will supply regular power or provide backup during a utility outage.
What Is Prime Power?
Prime Rated Power, usually shown as PRP, applies to supplying a variable electrical load for an unlimited number of operating hours per year, subject to the manufacturer’s specified conditions.
A construction site without a utility connection is one example of an application that may require prime power.
“Unlimited hours” does not mean unrestricted operation at full load. The applicable average-load limits, maintenance requirements and operating conditions still apply. A sustained constant-load application may require a different rating assessment.
For a delivery example with a stated prime rating, see our 1,010 kVA PRP containerised Kirloskar generator supplied in the UAE.
What Is Standby Power?
Emergency Standby Power, usually shown as ESP, applies when a generator supplies a variable load during an interruption of the normal utility supply.
For example, a commercial building may use a standby generator to support selected equipment during a power failure.
The standby rating should not be treated as the generator’s capacity for regular prime-power operation. Check the permitted operating hours, load conditions and other limitations in the applicable manufacturer documentation.
Prime vs Standby: What Should You Compare?
| Selection question | Prime power — PRP | Emergency standby — ESP |
|---|---|---|
| What is the generator’s role? | Supplying regular power under the specified duty | Providing backup during utility interruptions |
| What load profile applies? | Variable load within the rating conditions | Variable emergency load within the rating conditions |
| Which capacity should you use? | The published PRP figure | The published ESP figure, where the application qualifies |
| What else needs checking? | Average load, operating conditions and maintenance requirements | Operating-hour limits, average load and emergency-duty conditions |
Compare quotations using the same rating category. A generator advertised by its standby capacity should not be compared directly with another unit advertised by its prime capacity.
For an explanation of the electrical units, read our guide to kW vs kVA in diesel generators.
A Kirloskar Generator Example: 110WS50
MYSPAN’s published Kirloskar Legacy Series specifications list the following ratings for the 110WS50 model:
| Specification | Published value |
|---|---|
| Frequency | 50 Hz |
| Prime Rated Power — PRP | 100 kVA |
| Emergency Standby Power — ESP | 110 kVA |
The same model therefore has a 100 kVA prime rating and a 110 kVA emergency standby rating. It should not be described as providing 110 kVA for regular prime-power operation.
If your application requires 110 kVA of prime power, this model would not meet that requirement based on its published PRP figure.
Final selection must also account for starting loads, electrical characteristics and site conditions. Confirm the current datasheet and offered configuration when requesting a quotation.
What Matters for UAE Installations?
Choosing the correct duty rating is only part of generator selection.
For a project in Dubai, Sharjah, Abu Dhabi or elsewhere in the UAE, ask the supplier to confirm the capacity available under the actual installation conditions. Include:
- Expected ambient temperature and altitude.
- Generator-room or enclosure ventilation.
- Running loads and motor-starting requirements.
- Required voltage, frequency and phase configuration.
- Daily operating pattern and expected annual hours.
Ask whether the quoted output already accounts for the stated site conditions and whether any derating is required.
Our guide to choosing the right diesel generator in the UAE explains the wider selection process.
What Should You Include in Your Enquiry?
A request stating only “110 kVA generator” leaves an important question unanswered: 110 kVA under which operating duty?
For a more useful quotation, provide:
- The application and installation location.
- Whether utility power is available.
- Expected daily and annual operating hours.
- An equipment load list, including motors and their starting methods.
- Required electrical supply details.
- Any project specification or consultant requirements.
Ask the quotation to identify the proposed model, PRP and ESP ratings, applicable operating conditions and scope of supply.
Frequently Asked Questions
Is standby power always higher than prime power?
Many generator models have a higher published standby rating. Use the figures in the specific model’s datasheet rather than calculating one rating from the other using a fixed percentage.
Can a prime-rated generator provide emergency backup?
A generator with a prime rating may also have a published standby rating. Confirm that the offered configuration, controls and rating are suitable for the intended backup system.
Does the kVA rating alone confirm the correct generator size?
No. Selection must also consider kW demand, starting loads, load changes, operating duty and installation conditions.
Discuss Your Kirloskar Genset Requirements with MYSPAN
MYSPAN Power Solutions is the exclusive Kirloskar distributor for the MENA and CIS regions.
Explore our Kirloskar Legacy Series diesel generators to compare published models and ratings.
For a project-specific proposal, request a generator quotation and share your load list, operating hours, site location and required delivery date.
Once you have established the required operating duty, our guide to buying Kirloskar diesel generators in the UAE explains what to check before placing an order.